REIP · Rapid Edge Infrastructure Program

AI-optimized colocation. Demand-first capital deployment.

NexCore's Rapid Edge Infrastructure Program (REIP) acquires and activates existing powered facilities for AI-density colocation — a structurally underserved tier between hyperscale and enterprise build. Capital is deployed only against contracted tenant demand. This page is shared by direct link with qualified accredited investors and is not indexed publicly.

NexCore welcomes discussions with strategic capital partners, infrastructure investors, and operators aligned with accelerated deployment of mission-critical digital infrastructure.
40–50%+
Target IRR
Per site · Phase 1+1A
3.5–4.5×
Target MOIC
Per site · Phase 1+1A
~5–7 Mo
Time to Revenue
vs. 3–5 yr ground-up
~$6–8M
Equity Raise
Per MW deployed

The AI infrastructure gap.

Demand has already arrived. Supply won't catch up for years. The constraint is not customer demand — it is power availability and time to delivery.

6–18 Mo
AI Deployment Cycle
Customers funded and deploying now
3–5 Yrs
New Build Timeline
Site to commissioning — if power is available
2–4 Yrs
Utility Power Lead Time
Primary U.S. markets already queued out
3–10 kW
Legacy Rack Density
Structurally obsolete for AI workloads
Key Insight The constraint is not demand — it is power availability and delivery time. NexCore solves both by deploying inside existing powered infrastructure that already has utility interconnection in place.

Three non-negotiable disciplines drive every deal.

[ 01 ]

Acquire Existing Powered Facilities

Lease brownfield shells with utility interconnection already in place. Revenue-ready in months — at a fraction of new-build cost.

~$8M–$10M CapEx vs. $20–30M ground-up
[ 02 ]

Contract Demand Before Committing Capital

LOIs from qualified tenants are required before any facility lease is signed. Capital enters a deal — not a bet.

$0 capital at risk without validated demand
[ 03 ]

Expand in Phases, Each Independently Capitalized

Phase 2 triggers only upon contracted Phase 2 demand — with a dedicated raise. Existing investors receive right of first participation.

~5–7 mo. to first revenue vs. 3–5 yrs

Why this strategy wins.

Capacity gap

AI-driven compute demand outpaces the supply of contiguous, retrofittable data center capacity at the 1 MW–10 MW tier — the underserved middle of the market between hyperscale and enterprise.

Brownfield arbitrage

Existing facilities with utility interconnection in place can be repositioned for AI-density compute at a fraction of greenfield cost — creating a defensible cost-to-cure spread vs. new-build comparables.

Structural sweet spot

$8M–$10M per site is intentionally too small for institutional funds and too complex for regional builders — exactly right for NexCore's operating model.

Speed as a moat

5–7 months to revenue. Neo-cloud and AI operators cannot wait 3–5 years for a new build. NexCore is the only option at this tier that delivers inside their deployment window.

The numbers work — in both cases.

Revenue model is built on contracted capacity (base lease) with no commodity power exposure — utilities pass through directly to tenants.

Base Case · Phase 1+1A Stabilized
Per-site economics
Annual Revenue$4M–$6M
Stabilized EBITDA$2M–$3M
EBITDA Margin40–50%
Base Lease Rate$165–$195+/kW/mo
Upside Case · All Phases (~5,000 kW)
Site-level platform scale
Annual Revenue$10M–$13M
Stabilized EBITDA$7M–$10M
EBITDA Margin65–75%
Managed Services~$300K–$400K/yr

Conservative leverage. Strong investor protections.

Phase 1+1A · Per-Site Capital Stack
Total CapEx
~$8M–$10M
Equity (60%)
~$5M–$6M
Debt (40%)
~$3M–$4M
Debt Rate
6.5% Interest-Only
Year 1 DSCR
>5× covered

Phase 2 capitalized separately: ~$2M–$3M equity plus dedicated debt facility, triggered only by contracted Phase 2 demand. Existing investors receive right of first participation.

Investment criteria.

Capacity Per Site
1 – 10 MW
Asset Type
Brownfield · Powered Shell · Selective Retrofit
Equity Per MW Deployed
~$6M – $8M
Geography
North America · Opportunistic Global
Tenant Profile
Neo-cloud · AI · Enterprise · Federal
Hold Period
5 – 7 years

Exit pathway: 10×+ EBITDA.

Consistent with comparable high-density, AI-optimized colocation transactions in supply-constrained U.S. markets. Platform premium may expand the multiple as NexCore scales across additional target markets.

Base Case · Phase 1+1A · Year 5
Single-site exit economics
Year 5 EBITDA~$2.0M–$2.5M
Exit Multiple10×+ EBITDA
Exit Value~$22M–$28M
Net Equity to Investors~$18M–$24M
5-Yr IRR / MOIC40–50% / 3.5–4.5×
Upside Case · All Phases · Year 5
Stabilized platform exit
Year 5 EBITDA~$8M–$10M
Exit Multiple10×+ EBITDA
Exit Value~$88M–$110M
Net Equity to Investors~$75M–$95M
5-Yr IRR / MOIC60–70% / 7.5–9×

Experienced operators. Institutional partners.

PB
Pete Bianchini
Founder & CEO

25+ years across telecommunications, infrastructure, and real-estate-driven development. Former executive at Verizon and XO Communications, leading teams managing $150M+ in annual revenue across mission-critical networks. Brings deep industry relationships, site-selection judgment, and asset-repositioning experience to NexCore's deployment of next-generation edge and AI infrastructure.

SM
Stephen McCain
Chief Financial Officer

CPA with foundation in public accounting at PwC and a track record across multiple CFO roles. Led financial strategy across growth-oriented and government-focused organizations, with expertise in capital planning, M&A, reporting, and lender relationships. Disciplined, investor-focused approach to capital structure and scalable growth.

TC
TJ Ciccone
Strategic Advisor · Operations

Seasoned data center operations executive across hyperscale and enterprise environments. Currently CTO at Menlo Equities; previously led operations at STACK Infrastructure, with senior leadership roles at CoreSite and Amazon Web Services. Advises NexCore on uptime, reliability, and scalable performance of high-density compute environments.

AB
Adam Black
Strategic Advisor · Design & Construction

Senior infrastructure executive with deep experience delivering hyperscale and AI/HPC data centers at scale. Led 1.5+ GW of development and $10B+ in project value across roles at Google, Facebook, QTS, and DLB Associates. Advises NexCore on design strategy, construction execution, and scalable delivery.

Strategic Partners. Business Development supported by NextGen Technology Services (Dan Gallagher · 25+ years telecom). Mission-critical infrastructure delivery in alignment with ABM Industries (50+ years · design / build / operate).

Not a blind pool. Full visibility before commitment.

Deal-by-deal participation. Decision rights at every stage. Maximum $25K of pre-validation exposure.

1
Execute NDA
Full pipeline access · Preliminary underwriting · Financial models — no commitment required.
2
Feasibility Deposit
~$25K funds technical study · Secures priority allocation · Investor retains right to pass after review.
3
Diligence Package
Final CapEx · LOI status · Tenant credit profiles · Confirmed power commitments.
4
ProjectCo Equity
Priority allocation · 8% pref + waterfall · Full economic participation from Day 1.
Key Terms · 8% preferred return · 70/30 split post-pref · 50/50 at exit above 1.5× MOIC · $25K maximum pre-validation exposure · Right of first participation in subsequent phases.

Request the full investment memo and current pipeline overview.

Request Memo →

DISCLAIMER · The information on this page is provided for discussion purposes only with qualified accredited investors and does not constitute an offer to sell, or a solicitation of an offer to buy, any security or investment interest. All targets, projections, and forward-looking statements are based on management's current expectations and are subject to risks and uncertainties; actual results may differ materially. Past performance and target returns are not indicative of future results. Distribution restricted; please do not forward without prior written consent.